Resin Bound Driveways in Bromley

Our premium resin bound surfacing service covers all of Bromley and the surrounding areas. We are committed to

Quick Service Request

Request a callback.

Elegant Resin Bound in Bromley

Making your property look elegant, functional and sustainable is the challenge of every property owner in Bromley and we are here to help you transform your space with our premium resin bound surfacing services with service coverage throughout Bromley and the surrounding areas. You are just a step away from the idea of ​​our professional team.

Resin driveway installers

Preserving naturalness and harmony with the surrounding environment are our main virtues. As a local company, we know very well that a pleasant environment affects the quality of your daily life by providing you with a peaceful and relaxing view. You don’t have to worry about anything. The trust we have received from hundreds of resin bound projects completed in Bromley makes us feel proud and continue our mission.
How long does it take to install a resin driveway?

Usually between a few days and a week, depending on the size and complexity of the job.

When can I walk on a resin driveway?

It hardens within about 8 hours, but it’s best to wait 24 hours before walking on it and 48 hours before driving on it.

Where else can resin be used?

Besides driveways, resin is also used for paths, patios, terraces, car parks and similar areas.

Can I install a resin driveway myself?

It’s possible, but for a professional and long-lasting finish, it’s recommended to hire an experienced contractor.

Why do resin driveways crack?

Common reasons include poor installation, bad weather during or after fitting, the wrong material mix, or a weak base.

Do weeds grow through resin driveways?

No. A properly installed resin driveway prevents weeds from coming through.

Can I jet wash a resin driveway?

Yes. Resin surfaces are strong and durable, so they can be cleaned safely with a pressure washer.

Can I put plant pots on a resin driveway?

It’s best to avoid heavy concrete pots, as they can affect the surface over time.